Battery energy storage for industrial and commercial facilities: sizing, siting and integration assessed against how the site actually operates.

Topics

Where storage makes a practical difference.

Storage is worth evaluating when the load profile, cost structure or reliability requirement creates a defined problem to solve.

Peak demand management

Charging during lower-demand periods and discharging during higher-demand periods to reduce peak draw.

Load management

Shaping site load where production schedules, equipment starts or charging create sharp peaks.

Energy resilience

Ride-through and backup capability for operations where interruption is costly.

Electrification support

Storage used to moderate the demand impact of new electric load.

Grid integration

Protection, controls and metering requirements for a storage system at a commercial or industrial site.

BESS project assessment

System sizing basis, siting, safety requirements, cost basis and operating assumptions.

Honest limits

No guaranteed savings, funding or approval.

Storage performance depends on the site's load profile, tariff, equipment and operating pattern. MOTIRATECH HOLDING INC. does not guarantee savings, project economics, program funding, incentive eligibility or grid connection, and is not BC Hydro or an official BC Hydro partner.

Project inquiry

Tell us about your project

Share the current facts about your facility or project. A member of the MOTIRATECH team reviews every inquiry and responds by email.

Sending an inquiry does not create an agreement, and does not represent eligibility, funding, incentive approval, grid connection or savings of any kind. MOTIRATECH HOLDING INC. is not BC Hydro and cannot approve any utility program.